

NORTHERN ARIZONA (shipping from Verde Valley, AZ)
Tan Bricks
Price per Brick
Dimensions Stabilized (6% Portland) Semi-Stablized (4% Portland)
10 x 3.5 x 14 $1.50 $1.40
8 x 3.5 x 14 $1.40 $1.30
7 x 3.5 x 14 $1.30 $1.20
NON-STABILIZED BRICKS AVAILABLE UPON REQUESTS. PRICES DO NOT INCLUDE DELIVERY AND SHIPPING FROM VERDE VALLEY, AZ. ALL BRICKS SUBJECT TO TAX UNLESS OTHERWISE NOTED.
________________________________________________________________________________________________
SILVER CITY / DEMING, NEW MEXICO (shipping from Silver City, NM)
Red Bricks
Price per Brick
Dimensions Stabilized (6% Portland) Semi-Stablized (4% Portland)
10 x 3.5 x 14 $1.40 $1.27
8 x 3.5 x 14 $1.30 $1.20
7 x 3.5 x 14 $1.16 $1.10
Tan Bricks
Price per Brick
Dimensions Stabilized (6% Portland) Semi-Stablized (4% Portland)
10 x 3.5 x 14 $1.42 $1.31
8 x 3.5 x 14 $1.33 $1.24
7 x 3.5 x 14 $1.20 $1.12
NON-STABILIZED BRICKS AVAILABLE UPON REQUESTS. PRICES DO NOT INCLUDE DELIVERY AND SHIPPING FROM SILVER CITY, NM. ALL BRICKS SUBJECT TO TAX UNLESS OTHERWISE NOTED.
________________________________________________________________________________________________
TERMS & CONDITIONS
1. Forty Percent (40%) deposit required on pre-orders and sales with construction deadlines.
2. Forty Percent (40%) balance due upon completion of adobe at yard.
3. Twenty Percent (20%) balance due upon delivery of order’s first load.
4. Copy of Lab report on Compression Tests, Wet Compression Tests and Modulus of Rupture with each order
available on request for Building Safety Officials. Beyond Adobe, LLC complies with 2006 IBC, IRC & 2003 New
Mexico Earthen Building Materials Code: EARTHEN BUILDING MATERIALS CODE.
5. Breakage guaranteed not to exceed 5% at the time of delivery. Normal breakage rate is less than 2%.
6. Pallet deposits are $15.00. Customer responsible for returning re-usable pallets to adobe yard.
7. No returns on unused adobe.
8. Truck trailer forklift driver deliveries are available at $125.00 per hour port-to-port. We log in when we leave and
return to the yard for accurate time/charges.
9. Signed and dated Tax Exempt forms on file will be accepted.
10. Customer responsible for meeting deliveries on site to show drivers where to put the adobe. It's easy to put it in
just slightly the wrong place and it is so heavy... Beyond Adobe not responsible for placing adobe in wrong place.
11. Take-offs for your project are done ASAP and will be as close as we can to the estimated delivery times/charges.
If the delivery time is higher or lower we will make the adjustments as necessary.
12. Adobe products are unique, they are not perfect. There will be variances in size, color, texture, shrinkage and
cracks which may cause physical irregularities in the wall surfaces but do not impact the structural integrity of the
wall. Allowances to the contract will not be made as a result of such occurrences. Adobe is earth, after all. There
is always concrete for the perfectionists.